question

Gokhan Y. avatar image
Gokhan Y. asked ·

is it possible to exclude period of time from response time calculations

hello,

A client of mine has batch job during night and they dont want this to impact the business transactions avg time calculations. Is it possible to exclude some midnight times?

appmon7.0appmon 77.1
10 |2000000 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 50.0 MiB each and 250.0 MiB total.

James K. avatar image
James K. answered ·

I don't believe so no. Something can be set like a downtime for any incidents based on them but the actual business transactions themselves continue to be evaluated. I've never heard of something like you're describing.

I'd see if there's some criteria of those PurePaths you could filter out. If not I'm thinking and idea/rfe to see if anyone else has the same need.

James

Share
10 |2000000 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 50.0 MiB each and 250.0 MiB total.

Gokhan Y. avatar image
Gokhan Y. answered ·

thanks james... i did not think it would be possible either but just wanted to have second opinion, cheers

Share
10 |2000000 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 50.0 MiB each and 250.0 MiB total.