question

jose r. avatar image
jose r. asked ·

Upgrading dcrum2017sp7 to nam2019sp2

Hello everyone.

We currently have dcrum 2017 sp4 installed and our customer need to update to the last NAM. (now i´s sp2)


Can i doing without going through NAM2018?


Thanks in advanced.

Jose A

upgrade
10 |2000000 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 50.0 MiB each and 250.0 MiB total.

1 Answer

Jacek J. avatar image
Jacek J. answered ·

Hello Jose,

Unfortunately the answer is No.

You can not skip NAM 2018 stage during migration process, it is obligatory, we do support upgrade to next major version only.


Best Regards,


Jacek

1 comment Share
10 |2000000 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 50.0 MiB each and 250.0 MiB total.

thank you Jacek

0 Likes 0 · ·